| No. |
EFFECTIVE JANUARY 1, 2011 |
Revision Date |
|
| 01-11 |
Alarm Systems Using Single Path Communication
DMP 463G Communicator Approval
DMP 463C Communicator Approval
GS3055-ICF Communicator Approval
3G3070CF Communicator Approval
|
12/11 |
| 01-13 |
Plan Review and Inspection of Special Equipment - Dust Collection, Industrial Oven and Other.
Specialized Industrial Systems (OCFA Fee Code PR360)
|
01/13 |
| 08-02 |
Open Flame Cooking on Balconies Requirements |
08/09 |
| 09-98 |
Residential Fire Sprinkler Head Position with Regard to Sloped or Beam
Ceiling Configurations |
01/11 |
|
|
| 09-99 |
Outdoor Exchange Stations for Portable Liquefied Petroleum Gas (LPG)
Containers |
01/11 |
| 10-99 |
Inspection of Public School Facilities during Construction |
01/11 |
| 12-99 |
Remote Single Family Residence Water Supply |
01/11 |
| 07-00 |
Certification of Fire Extinguishing System Piping 4 Inches or Greater in
Diameter (See New Requirements) |
01/11 |
| 06-01 |
Single Family Residence Attic Sprinkler Protection Requirements
(See New Requirements) |
01/11 |
| 04-03 |
Self-Storage Facility Storage Height Limit Requirements |
06/03 |
| 05-03 |
Combustible Soil Gas Hazard Mitigation for Existing Homes Undergoing
Expansion in Yorba Linda |
01/11 |
| 01-07 |
Water Supply Mitigation for Midway City |
03/08 |
| 02-07 |
Santiago Fire Residences |
01/11 |
| 01-08 |
Approved SFPA/VHFHSZ Exclusions and Integration with 2010 Building Code
Chapter 7A [This bulletin is applicable only within Local Responsibility Areas (LRA)] |
01/11 |
| 02-13 |
Architectural Review and Construction Inspection of R-1, R-2, E and I-4 Occupancies. |
12/12 |